I was taught to paint by a professional and when estimating the amount of paint needed, I always allow for a second coat just to make sure of coverage. We interviewed a painter who tried to tell me I bought poor quality paint without knowing where I purchased it, and stated he would have to buy all new paint. He had not seen the cans and was just guessing so I asked him where I should buy paint from now on. It was the same place I had purchased my paint and he wanted to charge me an extra 20 a gallon more than what I paid for. Needless to say, I have interviewed numerous painters and they are not all honest.

These are some fantastic questions to ask and I particularly like the one that is concerned about safety for the painters. After all, if you have a large home and you’re hiring them to paint the exterior of that home then they’ll likely be on scaffolding. Because of that, you need to make sure that the contractor not only provides appropriate safety training, but has the correct liability insurance as well.
Oh, where to begin? Let me start with 'watered down paint'. 25-50% before the material gets to the site? Impossible. You would basically be painting with water at that point. It would be less of a hassle, and cost, to simply use proper material. You would be forced to apply three coats instead of two, as the coverage would be horrible. Whatever cost you think might be saved in materials would be lost in labor. House Painting Arvada Colorado
×